1st we must inspect all plumbing once the water is full at the cistern and running. We need to check for leaks and insure that all necessaries are working (ie toilet!)
3rd we need to work on drywall for the entire house! We wont be drywalling the front room as we want to keep the rustic charm of the log cabin addition. Of course I would like to do all of the trim with some sort of rough wood!
Somewhere in there we have several soft spots in the flooring that will need to be repaired!
Then we need to tackle the cabinets in the kitchen and bathroom. They are outdated and in need of repair.
Not a necessity but I really want to build a root cellar!
And.. last but not least! We absolutely MUST have a chicken coop!!